Boiler re-design and upgrade
- Coe Media
- Jul 27, 2023
- 1 min read
Old inefficient gas boiler out and new Viessmann 100 35kw compact installed. The heating system has been re-designed with new controls fitted for higher efficiency and reduced gas consumption.



Comments