
DCR provided a design to remove an unreliable oil boiler and internal fuel tank with a high efficiency heat pump system. This provided a solution to remove the oil tank and provide reliable heating. Our customer also took advantage of the £7500 BUS grant.

Our in house F-GAS engineers completed the installation along with our electricians. We installed new heating system controls that are all app based for easy remote control.
Comments